亚洲三区在线观看无套内射,日韩欧美电影91网,这里有国产视频,超级碰不卡视频

High quality hydraulic equipment manufacturers!
TELL:+8613184968882

steel mill cylinder Sold to Estonia

Release time:2023-12-09 16:24:19 Hits: Current position: Home > News

This article mainly introduces:

Estonia hydraulic cylinder,steel mill cylinder manufacturer,steel mill cylinder

Estonia steel mill cylinder

(Estonia steel mill cylinder,produced by Hengyu Hydraulic Co., Ltd)

steel mill cylinder are widely used in Estonia,because of high work efficiency,excellent fatigue and impact resistance,no need for deceleration device.So our company has designed steel mill cylinder for customers from Estonia.

Introduction to steel mill cylinder:

steel mill cylinder piston rod material selection and technical requirements: (I), because there is no special requirements, so use 45 steel as the piston rod material, the design of the piston rod only withstand pressure stress, so no modulation processing; (ii) The coaxial tolerance of the shaft journal and the outer circle of the mounting piston is not greater than 0.01mm, so as to ensure the coaxial degree of the outer circle of the piston rod and the outer circle of the piston, and avoid the stuck phenomenon of the piston and the steel mill cylinder, the piston rod and the guide. The vertical tolerance between the end face of the mounting piston and the axis of the piston rod is not more than 0.04mm/100mm to ensure that the piston installation does not produce skew; (iii) The outer circle of the piston rod should pay attention to the roughness; (iv) Because it is operated under low load conditions, surface treatment is omitted.

Before the steel mill cylinder is removed, the relief valve should be loosened to reduce the pressure of the hydraulic circuit to zero, and then the power supply should be cut off to stop the hydraulic device. After loosening the oil port piping, the oil plug should be applied to plug the oil port.

1, the hydraulic machinery should be kept clean, in order to prevent dust and debris from falling into the oil, the tank should be sealed. 2, the oil in the tank should be replaced regularly according to the working condition. When changing the oil, the dirt and impurities accumulated at the bottom of the tank should be removed and the tank should be cleaned. 3, hydraulic oil, oil drums should be set in a clean and safe place to strengthen management. The oil drum, oil filter, oil funnel, oil pipe, etc. used should be kept clean. The oil drums for loading hydraulic oil must be cleaned in advance, and the oil drums should be dedicated and not mixed with other oil drums.

Do not regularly check the damage of the chrome layer of the steel mill cylinder: completely extend the steel mill cylinder and carefully check whether there is any surface damage such as injury, strain, welding slag, such as the surface damage position, in the steel mill cylinder block < 20cm, and the damage depth < 5mm, should be repaired in time to prevent long-term damage to the steel mill cylinder seal. Welding slag is strictly prohibited on the surface of the steel mill cylinder.

Answers to some questions about steel mill cylinder:

Two cylinders have a reversing control, if the load of the two cylinders is not the same, how to ensure their synchronization?
The piston rod of the cylinder is required to extend synchronization: install A shunt collector valve or synchronous motor at port A of the direction control valve, and then connect the two outlets of the shunt collector valve to the rod-free cavity of the two cylinders respectively. It is required that the outlet of the diverter collector valve is connected to the rod cavity of the two cylinders respectively when the piston rod is withdrawn in synchronization. The synchronization performance depends on the quality of the diverter valve and the leakage of the hydraulic system.

Why the injection cylinder retreating after the injection molding machine is started?
It is likely that the projected area of the molded plastic parts is large or the injection pressure set is relatively large, resulting in the expansion force exceeding the clamping force of the injection molding machine, so the mold is backward. You can do the following attempts: 1, reduce the injection force of the injection molding machine; 2, if the injection molding part can not be well formed by reducing the injection force, it is recommended to install the mold to a larger injection molding machine.

Back to list Recommended article

Leave a message if you have any questions.

Send
Email

Email:hsslrubbertech@gmail.com7x24 hours

Glad to receive your consultation!:

Service
Tel

+8613184968882
7x24hours service

Add
Wechat

Add Wechat
TOP
中文Av字幕一区二区三区| 日本爱黄视频| www成人久久午夜电影久久| 日韩欧美第一业| 少妇VS久久| 亚洲有码 在线播放| 男人天堂丝袜久久久久久久久| 91白丝流水精品| 国产射精在线综合| 国产 日欧 一区| 18美女网| 一区二区三区超碰在线| 欧美熟女激情精品| 久久久久欧美成人电影| 日本成人福利网网站| 午夜中文字幕欧美精品下载| 91人妻熟妇精品在线| 欧美 一区 老师| 色综合网女| av一区二区三区APP| 美女脱裤子操b| 人妻后入人妻一区| 大鸡扒艹骚逼| 老热女,一区二区三区| 国产欧美另类在线观看| 黑人一区二区三区h| 农村妇女一区二区免费视频观看| www.18Av| 国产亚洲欧美精品久久黄片| 色av吧精品| AV亚州一区二区| 欧美日韩国产无码乱码| 久久久秘成久久| 久久久久亚洲电影| 牛精品一区| 亚洲精品午夜福利一区二区| 日本元吗免费一区二区| 精品在线观看无码不卡网站二区| 国产性色av青青青| 欧美操天天天天天天天天| 中文字幕AV日韩第一页|