亚洲三区在线观看无套内射,日韩欧美电影91网,这里有国产视频,超级碰不卡视频

High quality hydraulic equipment manufacturers!
TELL:+8613184968882

steel mill cylinder Sold to Pakistan

Release time:2023-12-12 10:13:33 Hits: Current position: Home > News

This article mainly introduces:

Pakistan hydraulic cylinder,steel mill cylinder manufacturer,steel mill cylinder

Pakistan steel mill cylinder

(Pakistan steel mill cylinder,produced by Hengyu Hydraulic Cylinder Factory)

steel mill cylinder are widely used in Pakistan,because of no need for deceleration device,long service life,smooth movement.So our company has designed steel mill cylinder for customers from Pakistan.

Introduction to steel mill cylinder:

There are some honeycomb holes in the inner wall of the steel mill cylinder, piston or piston rod surface. How is this formed? When we repair the steel mill cylinder, we can see that there are some honeycomb holes on the inner wall of the steel mill cylinder, the piston or the piston rod surface, which are caused by cavitation. Therefore, the cavitation of the steel mill cylinder is targeted to prevent. Is very necessary.

steel mill cylinder use should try to avoid sealing belt into the steel mill cylinder. As a simple sealing material, polytetrafluoroethylene plastic sealing tape is often used in installation and inspection, and if the winding method of the linear and ribbon-shaped sealing material is wrong, the sealing tape will be cut off and enter the steel mill cylinder. The wire belt seal will not have any effect on the winding of the sliding part, but it will cause the check valve of the steel mill cylinder to fail to operate or the buffer regulating valve can not be adjusted to the end. For the circuit, it may cause the action of the reversing valve, the relief valve and the reducing valve to fail.

The repair method of the steel mill cylinder: the repair of the steel mill cylinder must use brush plating. This is because this repair method can be carried out on site, and the repair effect is good. In this way, loading and transportation can be eliminated to shorten the repair time and improve work efficiency. In addition, the coating obtained by brush plating has good binding force and will not have obvious boundaries. Moreover, the repair surface has high hardness and good wear resistance.

The steel mill cylinder pipe should not be left behind when deburring at both ends after the fixed length processing. In addition, the placement of steel pipes near the site of welding pipeline operations is the cause of welding foreign objects. The pipes placed near the welding operation site should be sealed. It must also be noted that pipe fitting materials should be fully prepared on a dust-free workbench.

Answers to some questions about steel mill cylinder:

What is the meaning of dead volume in hydraulic cylinder?
Closed volume, also known as dead zone volume Positive displacement pump is dependent on the change of sealing working volume to achieve suction and pressure oil, in order not to make the suction and pressure oil cavity interworking, there is an oil sealing area between the suction and pressure oil cavity, when the sealing working volume passes through the oil sealing area, neither pressure oil cavity nor oil suction cavity communication, forming a closed sealing volume. The unloading groove is opened, and the grooving principle is that the sealing volume decreases and the oil pressure chamber is communicated, and the sealing volume increases and the oil suction chamber is communicated.

How is the hydraulic cylinder tempered?
The purpose of the tempering treatment is to make the piston rod have comprehensive mechanical properties of strength, hardness, plasticity and toughness, and the internal structure is uniform and fine tempered sorbite, so as to prepare the organization for subsequent surface quenching. The length of the long cylinder piston rod is 3800-4200, and the diameter is Φ90-Φ110mm, so its heating equipment uses a 150KW well resistance furnace or 600KW suspension continuous resistance heating furnace, and the temperature is controlled by two areas. Heat treatment process parameters: in the shaft furnace, a furnace is suspended with 4 pieces, the quenching heating temperature is 830±10℃, and after holding heat for 160min, it is divided into two times for quenching, and two pieces are quenched each time, and the circulating cooling water is used for cooling.

Back to list Recommended article

Leave a message if you have any questions.

Send
Email

Email:hsslrubbertech@gmail.com7x24 hours

Glad to receive your consultation!:

Service
Tel

+8613184968882
7x24hours service

Add
Wechat

Add Wechat
TOP
熟女原创视频1区2区3区| 久久久久久久综合影视| 日韩精品 自拍偷拍 国产| 国产精品1区2区3区4区5区| 日本精品99久久| 天天干天天干天天操天天爱天天| 欧美日韩一区二区 三区四| 午夜大片精品| 无码 地址 吃瓜| 精吕久久六| 国产欧美精品区发布123| 精品毛片一二区三区| 色大师一区二区三区在线观看| 欧洲视频一区二区免费不卡| 极品少妇内射在线视频精品| 黄色三级精品黄色三级国产| AV综合自拍| 国内自拍欧美亚洲| 日本中文字幕在线不卡视频| 日韩无码99| 精品国产乱码一区二区三吴APP| 日韩美AV不卡久久| 人人爽人人摸| 艹b网站天天看| 久久91精品国产91久久小草| 国产精品啪啪视频| 美日韩综合熟女少妇| 久久综合日韩视频| caoporn-最新超碰地址发布| 国产精选视频福利| 亚洲精品国产成人无码区| 亚洲视频国产精品| 亚洲AV一点不卡| 五月丁香六月婷婷俺也去久久久| 国外欧美一区二区三区人妻| 中国大鸡巴曰逼视频国产的| 国产欧美成人免费网站| 好吊韩在线| 久久久噜呀噜| 亚洲成人综合在线网| 日韩精品5页|